PRE- CONVERSION WORK ON ENGINE: Plenum Reverse and Valve Covers
I picked up the Powder Coated parts and replaced them on the engine, using new valve cover gaskets, spark plug gaskets, and intake manifold gaskets. Then went and bought various hoses needed due to the plenum reverse. Thankfully there is no EGR system on the plenum which would have complicated the plenum reverse. This later 1996-97 Celsior engine also does not have a cold start injector (CSI) which normally is attached to the bottom centre of the plenum. The absence of the CSI made it the plumbing much simpler.
PRE-CONVERSION WORK ON ENGINE: TPS, ISC and AFM Wiring
I am swapping/reversing the plenum around to the passenger (left) side to rig the snorkel and LPG system back up, so I re-routed the wires for the AFM (air flow metre), ISC (idle speed controller) and TPS (throttle position sensor) from the driver’s (right) side to the passenger (left) side so that they terminated at their new respective positions.
This involved removing a lot of the tape on the loom, (much of which was cracked from heat and time) and separating wires out, then re-routing them through parts of the plastic loom covers around the back of the engine. Some of them had to be teased out of the mass of wires in the loom then cut and resoldered so that they were neat. I covered the lot with conduit cover and then re-taped them.
Parts of the plastic loom covers had to be pared back to accommodate space.
Because a transfer case was being added to the back of the 1uzfe auto transmission the dash speedo sensor wires had to be lengthened about another 15cm so that they would reach to the back of the transfer case where the speed sensor is.