Well I got a steal on a new rack
A summit order came in with 4an, 8an, 12an nylon braided hose, some random fittings and a free 5 hour energy...
Made some lines, one for the cooler is half done
Turbo oil feed, went through the frame rail and I need to add fire sleeving near the turbo...