The plate between the engine and the gearbox is almost done. It's made out
of 20 mm aluminium.
And yes, I know it takes time, the plate has about 25 hours to it so far with
measuring, design, doing the outer cut from the bigger plate and marking it
for holes, drilling, tapping etc. Still, that is nothing compared to the
sump, I think I have spent over 80 hours on it and it is not done yet....